Val-matic 1-16 in. FloodSafe Inflow Preventer Manual de usuario Pagina 6

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 7
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 5
5
FloodSafe
®
Inflow Preventer
TEST AND MAINTENANCE REPORT
OWNER: _________________________________________________________________________________
ADDRESS: ________________________________________________________________________________
LOCATION OF ASSEMBLY: __________________________________________________________________
MANUFACTURER: _________________________ MODEL NO: ____________________________________
YEAR OF MANUFACTURE: _______________________ SIZE: ____________________________________
PROCEDURE: See “FIELD TESTING THE FLOODSAFE” in the Instruction Manual.
1. Isolation Valve
Under Air Valve
2. Inflow Preventer Test
Lower Chamber
3. Inflow Preventer Test
Upper Chamber
leaked or
closed off tight
test cocks OK or
test cocks replaced
open test cocks
test cock OK or
test cock replaced
Record any maintenance
performed:
Initial
Tests:
Connect test pipe assembly
to test cock A.
Fill lower chamber and test
pipe with clean water.
Maintain water level above
“Minimum Test Level”
Connect test pipe assembly
to test cock B.
Fill upper chamber and test
pipe with clean water.
Maintain water level above
“Minimum Test Level”
Inflow Preventer Basket
removed and cleaned
Observe test cock B for
leakage for 5 minutes.
Observe test cock C for
leakage for 5 minutes.
Any sign of leakage from test
cock is cause for rejection.
Pass Fail
Any sign of leakage from test
cock is cause for rejection.
Pass Fail
Bottom Plug
installed
Repairs:
Record maintenance
performed:
Record maintenance
performed:
Final
Tests
(when
needed):
If initial test failed, repeat 5
minute test. Any sign of
leakage from test cock B is
cause for rejection.
Pass Fail
If initial test failed, repeat 5
minute test. Any sign of
leakage from test cock C is
cause for rejection.
Pass Fail
IMPORTANT:
After testing, reopen the isolation valve under the air valve.
NOTE: All repairs and final tests should be completed within five (5) working days.
COMMENTS: _______________________________________________________________________________
___________________________________________________________________________________________
I hereby certify that this data is accurate and reflects the proper maintenance of the assembly.
TESTER: _____________________________ CERT No. __________________ DATE: __________________
TIME: ___________________
THIS ASSEMBLY: Passed Failed
Vista de pagina 5
1 2 3 4 5 6 7

Comentarios a estos manuales

Sin comentarios